Friday, 15 February 2013
thriller update
with our thriller underway we have been on location 3 times, we have got lots of footage to work with but unfortunately we had some faults with our equipment along the way on wednesday the camera died which put a spanner in the works for filming that day, so with a charged camera we returned and this time the tape decided to tell us that there was no room left to film on, again stopping filming for that day. So now with all our little hitches hopefully sorted out we plan to return to our location and finish filming during the half term.
Tuesday, 12 February 2013
Ident
This is a screenshot of our ident on photoshop you will see that the image moves, the lightening and name flickers.
kelsey and rachel health and safety evaluation
This is our health and safety tour, we concluded that the risks we not very serious, the conditions may even help make our thriller better adding slight elements of danger.
We decided that the mud and water were not too significant to stop us being able to film on this location.
The main safety point would be the slipperiness of the slight hills but the video shows that you can get up them, as we know it can be done we will probably use a shot like this in our film, it will add suspense as to whether they can get up it or not.
rachel and kelsey recky tour
This is out recky tour, we went to Hainalt and scouted the area out, to see what we would be working with. We scouted the area to see what locations would be best for different shots.
Monday, 4 February 2013
contingency plan
Contingency Plan
Name:
Kelsey Garrett
Production:
Illutions
Potential problems and how to overcome these problems:
Slipping
Rain
Plan
safer environment
waterproof equipment
First aid kit
Friday, 1 February 2013
moodboard.
http://prezi.com/bclsqbxjrban/present/?auth_key=tzh97e4&follow=vhl9nt4gkh6o&kw=present-bclsqbxjrban&rc=ref-30164357
Subscribe to:
Comments (Atom)
